JIP Schedule and Workscope
 


 - Milestones

The table below shows the measures of success for each milestone.

Milestone 1
  • Preparation of OIWM for field trial 1:
    • Resolution of fouling issue either through means of cleaning window or correcting for fouling through algorithm
    • Refinement of concentration algorithm to acceptable level of accuracy when compared with other analysis technologies and implementation into OIWM software
    • Successful undertaking of modifications and characterisation necessary to prepare OIWM for specific field trial site
  • Successful field trial 1:
    • Provision of reliable concentration data on a platform or an onshore field for up to 6 months
  • Successful start to modifications to OIWM design to be undertaken concurrently with field trial as a result of learnings from the field trial
Milestone 2
  • Completion of modifications to OIWM as a result of learnings from field trial 1
  • Subsea OIWM design:
    • Production of specification
    • Electronics and system design
    • Software design
    • Subsea packaging design
  • Successful field trial 2:
    • Provision of reliable concentration data on a platform or an onshore field for up to 6 months such as to give confidence of the OIWM's suitability for commercialisation
  • Beginning of work to qualify OIWM for both environmental and duty applications
Remaining activities
  • Completion of environmental qualification
  • Completion of duty qualification
  • Provision of final report
Table 4: Activities to be completed and measures of success for each payment-related milestone

 

 