The table below shows the measures of success for each milestone.
| Milestone
1 |
- Preparation
of OIWM for field trial 1:
- Resolution
of fouling issue either through means of cleaning window
or correcting for fouling through algorithm
- Refinement
of concentration algorithm to acceptable level of accuracy
when compared with other analysis technologies and implementation
into OIWM software
- Successful
undertaking of modifications and characterisation necessary
to prepare OIWM for specific field trial site
- Successful
field trial 1:
- Provision
of reliable concentration data on a platform or an onshore
field for up to 6 months
- Successful
start to modifications to OIWM design to be undertaken concurrently
with field trial as a result of learnings from the field trial
|
| Milestone
2 |
- Completion
of modifications to OIWM as a result of learnings from field
trial 1
- Subsea
OIWM design:
- Production
of specification
- Electronics
and system design
- Software
design
- Subsea
packaging design
- Successful
field trial 2:
- Provision
of reliable concentration data on a platform or an onshore
field for up to 6 months such as to give confidence of the
OIWM's suitability for commercialisation
- Beginning
of work to qualify OIWM for both environmental and duty applications
|
| Remaining
activities |
- Completion
of environmental qualification
- Completion
of duty qualification
- Provision
of final report
|
|
Table
4: Activities to be completed and measures of success for each
payment-related milestone
|